The ASTM
E-2018 Standards provides guidelines for
performing a baseline (PCA) commercial
property assessment and completing a (PCR)
property condition report.
The (PCA)
Property Condition Assessment is to observe
and report, to the extent feasible on the
physical condition of the subject property
and consists of:
-
Documentation Review and Interviews
-
Walk-Through Survey
-
Preparations of Opinions of Probable
Costs to Remedy Physical Deficiencies
($3,000 or greater per incident or an
aggregate of $10,000 or more per
building)
-
Property
Condition Report
All of our property condition
assessments use the baseline property
condition assessment process as outlined in the ASTM E-2018 standards and
our fees are quoted accordingly.
Request
a Quote
The
assessment includes physical deficiencies
defined as "the presence of conspicuous
defects or material deferred maintenance of
a subject property's material systems,
components, or equipment observed during the
field observer's walk-through survey".
"This
specifically excludes deficiencies that may
be remedied with routine maintenance,
miscellaneous minor repairs, normal
operating maintenance, etc and excludes de minimis conditions that generally do not
present material physical deficiencies".
These items are included in our
Property Condition Inspection Services.
NOTE: ASTM Standards state the following
regarding deviations from this standard:
"This guide
also recognizes that there are varying
levels of property condition assessment and
due diligence that can be exercised that are
both more and less comprehensive than this
guide, and that may be appropriate to meet
the objective or the user. Users should
consider their requirements, the purpose
that the PCA is to serve, and their risk
tolerance level before selecting the
consultant and the level of due diligence to
be exercised by the consultant."
This provision allows you to specify deviations
that meet your
individual needs and
building type. These deviations would be mutually agreed upon and clearly
stated in the engagement documents and final report.
These deviations may
reduce the scope of the assessment due to
financial and/or time constraints or exceed the assessment standards and include dismantling and operation of
readily accessible key systems
like HVAC,
maintenance suggestions, long term replacement schedules and cost to remedy
defects with no minimum cost threshold for reporting.
Warehouses,
Industrial
Properties, Manufacturing Plants
Storefronts, Malls, Strip-Malls, Retail
Buildings
Hotels-Motels, Long Term Care Facilities
Apartment Buildings & Office Buildings
Commercial
Real Estate Services available in
Illinois, Indiana, Michigan and Wisconsin Since 1987
Same day quotes available on most projects
Request
a Quote
Typical scheduling 2-5
days after proposal acceptance
Electronic PDF report 2-3 days following site visit
Printed report delivered 3-5 days following site visit